Concealed damage can change the work sequence after removal begins. The contractor should explain what was discovered and what decisions are needed. A delay is more manageable when documentation and authorization procedures already exist.
What to do next
Ask for the affected location, supporting photographs, and revised scope or schedule. Coordinate any required design or trade input promptly. Keep temporary protection and occupied-building needs in the discussion while the permanent correction is being determined.