South Florida · Commercial storefronts

Your business. A considered entrance.

Make the first impression work harder.

Glass, framing and entry details shape how customers meet your business. Plan a new storefront, replacement or renovation with the whole frontage in mind.

Request a storefront survey Explore storefront services
Illustrative commercial storefront elevationA light stone façade with an aluminum-framed glass frontage, paired entrance doors, signage zone and pedestrian approach. Select glazing, framing, entrance or perimeter to highlight that detail. Concept only, not a completed Perkins project or compliant design. YOUR BUSINESS AN ENTRANCE, CONSIDEREDGLASS / FRAME / ENTRY / PERIMETER
Original storefront concept · illustration, not a named project or product specification

Visibility with a specification.

Compare glass appearance, daylight and solar-control options alongside the required opening protection and system documentation. A tint or thickness alone does not establish performance.

A precise frame for the frontage.

Aluminum and metal systems need dimensions, anchors, supporting conditions and finishes suited to the selected assembly and property. Resolve these before fabrication.

A welcome that works every day.

Consider the approach, clearances, threshold, door operation and hardware together. Automatic entry systems also need appropriate safety, power and service planning.

Connect the storefront to the building.

Head, sill and jamb details must work with the surrounding wall and water-management system. Diagnose leaks before choosing a perimeter repair or replacement.

1980Perkins Roofing founded

6 countiesSouth Florida service area

Miami + JupiterSpeak with your local office

All construction services ↗

New locations · Renovations · Replacements

A cohesive frontage.
A clearly defined scope.

Retail, hospitality, healthcare and office properties need an entrance that suits their use. Bring the visible design and the practical requirements into one conversation.

Glass & metal systems

Frame the business.

Glass storefront installation and aluminum or metal systems, with dimensions, finish and anchorage coordinated for the opening.

Doors & access

Consider every arrival.

Manual and automatic entry systems, hardware and door operation. Confirm power, security and service needs alongside accessibility and egress review.

Identity & signage

Give the façade a clear voice.

Custom signage and branding coordination: agree locations, attachments, landlord criteria and any lighting, electrical or separate sign approvals.

Comfort & daylight

Specify beyond the appearance.

Discuss energy-efficient glass and insulation options using product performance and the actual building design. No bill-saving percentage is assumed.

Repairs & maintenance

Start with the problem.

Leaks, damaged glazing or difficult door operation call for an assessment. Ask about urgent repair availability; no response time or after-hours service is guaranteed.

Related construction

Connect the surrounding work.

Coordinate openings, wall repairs, finishes and tenant improvements. Changes to supporting structure need appropriate design review.

Commercial construction ↗

For occupied businesses

Plan the work.
Protect the operation.

An opening date is a business commitment. Discuss the dependencies and interruption risks early, not after the frontage is removed.

Discuss your project timeline

Agree who approves what.

Identify the owner, landlord, tenant and design-team responsibilities. Confirm lease criteria and the boundary between frontage and interior work.

Resolve procurement before removal.

Plan around verified dimensions, fabrication, delivery and material checks. Establish how the opening will be secured if replacement cannot happen immediately.

Map access and protection.

Review customer and staff routes, work-zone separation, deliveries and security. An alternate entrance or temporary closure may be necessary.

Communicate the sequence.

Agree work windows, tenant notices and inspection dependencies. Staying open is a site-specific decision—not a blanket promise.

Check before fabrication

Details that deserve
an early decision.

Use the project address and exact system to resolve requirements. A product name or a concept sketch does not establish that an installation is appropriate.

Accessible entry

Consider approach, landings, maneuvering space, clear opening, threshold and hardware together. Coordinate the design with applicable accessibility and egress requirements.

U.S. Access Board entrance guidance ↗

These references support project review; they do not certify the illustration or your property’s compliance.

From survey to handover

Make the decisions
in the right order.

Design, approvals and fabrication shape the installation window. A clear scope connects them to your operating needs.

Survey & priorities

Confirm the opening, existing condition, intended use and target dates. Identify landlord, tenant and design-team responsibilities.

Design & approvals

Coordinate system documentation, appearance, entry requirements and applicable permits or design review before ordering.

Fabrication & site plan

Confirm measurements, procurement and access. Agree protection, delivery, security and any required interruption to operations.

Installation & handover

Coordinate removal and installation, required inspections, door operation, finish review and care information.

Bring the right information
to the first conversation.

Share the address, property use, photographs, known damage and desired opening date. Existing drawings and landlord requirements are helpful where available.

Plan your storefront
  • OpeningLocation, dimensions, condition and surrounding construction.
  • AssemblyFrame, glazing, doors, hardware and applicable documentation.
  • OperationOccupancy, access, deliveries, security and work windows.
  • ScopeSignage, electrical, wall repairs, finishes and exclusions.
  • HandoverInspection, operation checks, cleanup, maintenance and written warranty terms.

Practical answers

Before you
change the frontage.

Systems, entry requirements and the business behind the glass.

Construction advice library ↗
What commercial storefront services does Perkins offer?

Discuss glass storefront installation, metal and aluminum systems, doors and entry systems, signage coordination, glazing options, repairs and maintenance. New locations, renovations and expansions can be reviewed with the team. Product availability and the exact scope are confirmed for your property.

Do you work with retail, restaurants and offices?

Perkins’ storefront services can be discussed for retail, hospitality, healthcare and office properties. Each use has different access, operating, privacy and presentation needs. Share the intended use and whether the business is already occupied when requesting a survey.

Must the storefront use impact-rated glass?

The opening-protection requirements depend on the address, building and scope. Have the project team confirm the applicable requirements and acceptable system documentation before ordering. Glass, frame, anchorage, sizes and installation conditions need to be reviewed together; a marketing label alone is not enough.

How can I check the product documentation?

Ask for the exact system identification and applicable approval documents, including permitted sizes, glazing, anchors and installation conditions. Florida Product Approval and Miami-Dade Product Control offer public lookup tools. The project team and relevant building department must confirm applicability to the actual opening.

Can you include automatic doors and entrance hardware?

Automatic doors and entry systems can be included in the scope discussion. Review suitability, availability, operators, sensors, power, locks and maintenance needs. Door operation, accessibility and egress requirements must be coordinated for the specific use and design.

Can my business remain open during replacement?

Possibly, but it cannot be promised before the site and work sequence are assessed. Discuss alternate access, separation from the work, security, noise and any necessary closures. Continued operation depends on a safe, compliant plan accepted by the relevant project parties.

What should we consider for an accessible entrance?

Review the route to the entry, landing and maneuvering space, clear opening, threshold and operable hardware as one coordinated design. Requirements vary with the configuration and project scope. Use the applicable standards and qualified project review rather than assuming an automatic door alone makes an entrance compliant.

Can signage and branding be included?

Discuss sign locations, branding, dimensions, attachment and any lighting or electrical coordination with the storefront scope. Landlord criteria and applicable sign or design approvals may affect the result. Confirm whether sign fabrication, installation and electrical work are included in the proposal.

Do you offer storefront repairs or urgent assistance?

Contact Miami or Jupiter to discuss damaged glass, door operation, leaks or other concerns and confirm repair or maintenance availability. For urgent work, ask the office about the available response window; after-hours service is not guaranteed. Keep people away from unstable glazing or unsecured work areas.

What determines the cost and opening schedule?

Dimensions, system selection, glazing, hardware, access, existing conditions, approvals and fabrication all affect the proposal and schedule. Share your desired opening date early, but do not treat it as confirmed until the dependencies and installation plan have been agreed.

Your next step

Let’s plan
your first impression.

Opening a location or improving an existing one? Tell Miami or Jupiter about the property, the frontage and your priorities.

Request a storefront survey

Scope, system selection, price and schedule are confirmed for your property.

All construction services ↗