Glass & metal systems
Frame the business.
Glass storefront installation and aluminum or metal systems, with dimensions, finish and anchorage coordinated for the opening.
South Florida · Commercial storefronts
Make the first impression work harder.
Glass, framing and entry details shape how customers meet your business. Plan a new storefront, replacement or renovation with the whole frontage in mind.
Request a storefront survey Explore storefront servicesCompare glass appearance, daylight and solar-control options alongside the required opening protection and system documentation. A tint or thickness alone does not establish performance.
Aluminum and metal systems need dimensions, anchors, supporting conditions and finishes suited to the selected assembly and property. Resolve these before fabrication.
Consider the approach, clearances, threshold, door operation and hardware together. Automatic entry systems also need appropriate safety, power and service planning.
Head, sill and jamb details must work with the surrounding wall and water-management system. Diagnose leaks before choosing a perimeter repair or replacement.
1980Perkins Roofing founded
6 countiesSouth Florida service area
Miami + JupiterSpeak with your local office
All construction services ↗New locations · Renovations · Replacements
Retail, hospitality, healthcare and office properties need an entrance that suits their use. Bring the visible design and the practical requirements into one conversation.
Glass & metal systems
Glass storefront installation and aluminum or metal systems, with dimensions, finish and anchorage coordinated for the opening.
Doors & access
Manual and automatic entry systems, hardware and door operation. Confirm power, security and service needs alongside accessibility and egress review.
Identity & signage
Custom signage and branding coordination: agree locations, attachments, landlord criteria and any lighting, electrical or separate sign approvals.
Comfort & daylight
Discuss energy-efficient glass and insulation options using product performance and the actual building design. No bill-saving percentage is assumed.
Repairs & maintenance
Leaks, damaged glazing or difficult door operation call for an assessment. Ask about urgent repair availability; no response time or after-hours service is guaranteed.
Related construction
Coordinate openings, wall repairs, finishes and tenant improvements. Changes to supporting structure need appropriate design review.
Commercial construction ↗For occupied businesses
An opening date is a business commitment. Discuss the dependencies and interruption risks early, not after the frontage is removed.
Discuss your project timelineIdentify the owner, landlord, tenant and design-team responsibilities. Confirm lease criteria and the boundary between frontage and interior work.
Plan around verified dimensions, fabrication, delivery and material checks. Establish how the opening will be secured if replacement cannot happen immediately.
Review customer and staff routes, work-zone separation, deliveries and security. An alternate entrance or temporary closure may be necessary.
Agree work windows, tenant notices and inspection dependencies. Staying open is a site-specific decision—not a blanket promise.
Check before fabrication
Use the project address and exact system to resolve requirements. A product name or a concept sketch does not establish that an installation is appropriate.
Confirm wind, debris-protection and applicable approval requirements. Review the frame, glazing, dimensions and anchors as the documented assembly.
Miami-Dade Product Control ↗Florida Product Approval search ↗Consider approach, landings, maneuvering space, clear opening, threshold and hardware together. Coordinate the design with applicable accessibility and egress requirements.
U.S. Access Board entrance guidance ↗Define perimeter flashing, seals, drainage and adjoining finishes. Confirm any landlord, municipal design, sign or historic-review requirements.
Related entrance-door work ↗Structural modifications ↗These references support project review; they do not certify the illustration or your property’s compliance.
From survey to handover
Design, approvals and fabrication shape the installation window. A clear scope connects them to your operating needs.
Confirm the opening, existing condition, intended use and target dates. Identify landlord, tenant and design-team responsibilities.
Coordinate system documentation, appearance, entry requirements and applicable permits or design review before ordering.
Confirm measurements, procurement and access. Agree protection, delivery, security and any required interruption to operations.
Coordinate removal and installation, required inspections, door operation, finish review and care information.
Share the address, property use, photographs, known damage and desired opening date. Existing drawings and landlord requirements are helpful where available.
Plan your storefrontPractical answers
Systems, entry requirements and the business behind the glass.
Construction advice library ↗Discuss glass storefront installation, metal and aluminum systems, doors and entry systems, signage coordination, glazing options, repairs and maintenance. New locations, renovations and expansions can be reviewed with the team. Product availability and the exact scope are confirmed for your property.
Perkins’ storefront services can be discussed for retail, hospitality, healthcare and office properties. Each use has different access, operating, privacy and presentation needs. Share the intended use and whether the business is already occupied when requesting a survey.
The opening-protection requirements depend on the address, building and scope. Have the project team confirm the applicable requirements and acceptable system documentation before ordering. Glass, frame, anchorage, sizes and installation conditions need to be reviewed together; a marketing label alone is not enough.
Ask for the exact system identification and applicable approval documents, including permitted sizes, glazing, anchors and installation conditions. Florida Product Approval and Miami-Dade Product Control offer public lookup tools. The project team and relevant building department must confirm applicability to the actual opening.
Automatic doors and entry systems can be included in the scope discussion. Review suitability, availability, operators, sensors, power, locks and maintenance needs. Door operation, accessibility and egress requirements must be coordinated for the specific use and design.
Possibly, but it cannot be promised before the site and work sequence are assessed. Discuss alternate access, separation from the work, security, noise and any necessary closures. Continued operation depends on a safe, compliant plan accepted by the relevant project parties.
Review the route to the entry, landing and maneuvering space, clear opening, threshold and operable hardware as one coordinated design. Requirements vary with the configuration and project scope. Use the applicable standards and qualified project review rather than assuming an automatic door alone makes an entrance compliant.
Discuss sign locations, branding, dimensions, attachment and any lighting or electrical coordination with the storefront scope. Landlord criteria and applicable sign or design approvals may affect the result. Confirm whether sign fabrication, installation and electrical work are included in the proposal.
Contact Miami or Jupiter to discuss damaged glass, door operation, leaks or other concerns and confirm repair or maintenance availability. For urgent work, ask the office about the available response window; after-hours service is not guaranteed. Keep people away from unstable glazing or unsecured work areas.
Dimensions, system selection, glazing, hardware, access, existing conditions, approvals and fabrication all affect the proposal and schedule. Share your desired opening date early, but do not treat it as confirmed until the dependencies and installation plan have been agreed.
Your next step
Opening a location or improving an existing one? Tell Miami or Jupiter about the property, the frontage and your priorities.
Request a storefront surveyScope, system selection, price and schedule are confirmed for your property.
Miami office
305-642-7663 — call the Miami officeMonroe · Miami-Dade · Broward
Jupiter office
561-559-7663 — call the Jupiter officePalm Beach · Martin · St. Lucie