Roof replacement in South Florida A new roof. Built from the deck up.

Roof replacement and re-roofing across South Florida, from the Perkins Miami and Jupiter offices.

A roof replacement takes the old roof off to the deck, repairs the deck, then installs a new water barrier, flashing and covering under a building permit and inspections. Perkins Roofing, Florida certified roofing contractor CCC1331944, replaces tile, metal, shingle and flat roofs from Miami to the Treasure Coast.

Plan your roof replacementExplore the details
Intersecting gray shingle roof planes with valleys, dormers and timber gable details.DECK / DETAILS / FINISH
Roof installation reference published by Perkins · not a named completed project

★ 4.8 · 5.0228 Google reviews · Miami 4.8 · Jupiter 5.0

CCC1331944Active Florida certified roofing contractor license

Since 1980FRSA & RCASF member · Polyglass contractor

Explore project records ↗

Roof replacement

Roof replacement options: tile, metal, shingle and flat

Roof geometry, structure, exposure, maintenance and budget guide the choice. Confirm samples and the approved assembly before ordering materials.

Concrete & clay tile

A distinctive South Florida roof with weight and attachment requirements to resolve. On some existing roofs, resetting usable tile over new underlayment may be worth evaluating.

Explore related service ↗

Standing-seam metal

Clean panel lines and concealed fastening options. Review substrate flatness, thermal movement, coastal material selection and the exact panel system.

Explore related service ↗

Architectural shingle

Compare installed scope and appearance alongside fastening, starter course, ventilation and flashing details. Performance depends on the complete installation.

Explore related service ↗

Flat & low-slope

Membrane systems for suitable flat sections, additions and porches. Match the roof slope and drainage to the specified system, including transitions to pitched roofs.

Explore related service ↗

The roof studies

What a roof replacement replaces beneath the covering

Explore the four parts of a replacement scope. Ground-up installation follows the approved new-construction plans; a re-roof also has existing conditions to uncover.

Exposed plywood roof decking with staggered panel joints before underlayment is installed.

Roof deck · the structural base beneath the covering

01 · Deck

Start with a sound base.

For a full tear-off, remove the existing roof to expose the structural deck. Check damaged sheathing and the attachment requirements before the new assembly covers them.

  • Confirm tear-off, disposal and temporary protection.
  • Agree deck replacement pricing before opening the roof.
  • Document concealed conditions and required fastening work.

What to clarifyA deck scope with a defined process for discoveries.

Overlapping dark roofing underlayment covering a sloping roof before shingles are installed.

Water protection · the specified membrane beneath the finish

02 · Water barrier

Protect the layers beneath.

Install the specified underlayment and required secondary water protection as part of the approved assembly. Laps, transitions and attachment matter alongside the product name.

  • Specify the underlayment and installation method.
  • Confirm secondary water barrier requirements.
  • Coordinate inspections before concealed work is covered.

What to clarifyA water-protection scope suited to this roof system.

Metal flashing at the junction of a gray shingle roof and a white stucco chimney.

Flashing · connect the roof to walls and penetrations

03 · Flashing

Resolve every interruption.

Valleys, walls, skylights, chimneys and pipes need coordinated flashing. Clarify which existing components will be replaced and how the new details join the surrounding construction.

  • Include valley, wall and penetration details.
  • Review new edge metal and compatible fasteners.
  • Resolve adjacent repairs and scope exclusions.

What to clarifyDefined details at the places a roof changes direction.

A completed gray architectural-shingle hip roof with capped hips and ridge above white fascia.

Finished covering · the visible part of the complete system

04 · Finish

Complete the system.

Install the selected covering and resolve ventilation for the building’s attic or roof design. Closeout should include inspection status, cleanup and applicable warranty documents.

  • Confirm final color, profile and material selections.
  • Review intake and exhaust where ventilation is specified.
  • Collect permit records, care guidance and warranty terms.

What to clarifyA finished roof with a documented handover.

Process and timeline

The roof replacement process, step by step

Every re-roof runs through the same six stages. How long each one takes depends on the roof, the weather and the building department, so there is no honest fixed number of days.

Before work starts

  1. Inspection and proposal. An estimator measures the roof and documents it with photos; the price comes in a written, itemized proposal.
  2. Permit. The permit is applied for with the building department for your address, naming approved roofing products.

On the roof

  1. Tear-off and deck. The old roof comes off to the deck; damaged sheathing is replaced at the rates in the proposal and the deck is fastened as the code requires.
  2. Dry-in and in-progress inspection. The water barrier goes on and is inspected before anything covers it.
  3. Covering and flashing. Tile, metal, shingle or membrane, with new flashing at valleys, walls and penetrations.

Closeout

  1. Final inspection. The permit is closed with a passed final inspection, and you receive the permit record, care guidance and the written warranty terms.

Roof size, the system, deck repairs found at tear-off, product delivery, rain and inspection scheduling all move the timeline. Ask for the sequence in writing before work begins.

Permits and the HVHZ

Roof replacement permits, county by county

A roof replacement is permitted by the city or county building department for the address. The biggest difference across South Florida is whether the roof is inside the High-Velocity Hurricane Zone.

Miami-Dade and Broward: HVHZ

The Florida Building Code defines the High-Velocity Hurricane Zone as Broward and Miami-Dade counties. Products need approval for HVHZ use, usually a Miami-Dade Notice of Acceptance. Cities add their own paperwork: Fort Lauderdale, for example, requires a notarized deck re-nailing and water-barrier affidavit before the tin-cap inspection. Miami-Dade tile re-roofs also face the 2027 tile underlayment change. See roofing in Miami.

Palm Beach, Martin and St. Lucie

Outside the HVHZ, re-roofs follow the statewide Florida Building Code, with products carrying a Florida Product Approval. Each city still runs its own permit desk: see Jupiter, Stuart and Port St. Lucie.

Repair or replace: the 25% rule

Florida’s 25 percent rule does not force a full re-roof in every case: roofs built, repaired or replaced under the 2007 Florida Building Code or later can have a qualifying exception. Read Florida’s 25% roof rule before deciding, or start with roof repair if the roof may still be serviceable.

Cost and financing

Roof replacement cost: rough estimate ranges

Rough estimate only, not a quote. These are the planning ranges the Perkins roof calculator uses, per square (100 square feet) installed, with tear-off of one layer, underlayment, standard flashing and the permit. Your price comes only from a measured inspection and a written proposal.

Rough estimate by roof type

  • Architectural shingle: about $500 to $950 per square
  • TPO or modified bitumen (low-slope): about $600 to $1,400
  • Concrete tile: about $1,000 to $1,700
  • Standing-seam metal: about $1,100 to $2,300
  • Clay tile: about $1,400 to $2,500

Your own numbers

The roof calculator shows all five ranges as a rough estimate once you outline your roof on the satellite map. Deck repairs, extra layers and HVHZ product requirements are not in the ranges; the roof replacement cost guide explains what moves a roof inside or outside them.

Paying for it

The Financing link in the main menu opens the application of Perkins’ financing provider. Availability, approval and terms are set by the provider; no approval is promised. Insurance questions go to your insurer or agent: an estimate does not establish coverage.

Before the estimate

Bring the property.
We’ll talk through the scope.

A useful first conversation starts with the address, the concern and what you want to achieve. Existing records help, but you do not need all the answers to begin.

Plan your roof replacement
  • Existing roofAddress, current covering, approximate age, leaks and any reports.
  • Material choicesPreferred look, association rules, samples and structural constraints.
  • Proposal scopeDeck rates, new flashing, underlayment, disposal and permit responsibilities.
  • Daily lifeWork-from-home needs, pets, attic storage, driveway and neighbor access.
  • CompletionInspection closeout, outstanding items and written warranty conditions.

South Florida considerations

Living through a roof replacement

Property conditions, product limitations and local review affect the final scope. Confirm what applies before work is authorized.

Noise, dust & access

Tear-off can bring vibration and dust. Discuss protecting stored items, sensitive interiors and landscaping, plus the location of vehicles, materials and debris containers.

Weather & schedule

Roof complexity, discovered damage, product availability, inspections and rain affect duration. Ask for the expected sequence and how schedule changes will be communicated.

Permits & insurance

Confirm address-specific permit, inspection and retrofit requirements. Ask your insurer about policy coverage for a covered loss and code upgrades; an estimate does not establish coverage.

Practical answers

Roof replacement FAQ

Understand the scope, the choices and what to ask next.

Roofing article archive ↗Roof inspections ↗
How long does a roof replacement take?

There is no fixed number of days. Roof size and complexity, the roof system, deck repairs found at tear-off, product delivery, rain and inspection scheduling all move it. Ask for the project sequence in writing, from permit and tear-off through dry-in, inspections and cleanup, before work begins.

How much does a roof replacement cost in South Florida?

Rough estimate: Perkins plans replacements at about $500 to $950 per square (100 square feet) for architectural shingle, $600 to $1,400 for TPO or modified bitumen, $1,000 to $1,700 for concrete tile, $1,100 to $2,300 for standing-seam metal and $1,400 to $2,500 for clay tile. These are the roof calculator’s planning ranges, not a quote; the price comes from a measured inspection and a written proposal.

Is my roof replacement in the High Velocity Hurricane Zone?

Only in Miami-Dade and Broward. The Florida Building Code defines the HVHZ as those two counties, so roofing products there need approval for HVHZ use, usually a Miami-Dade Notice of Acceptance or a Florida Product Approval listed for the HVHZ. Palm Beach, Martin and St. Lucie re-roofs follow the statewide code with Florida Product Approval.

What if damaged decking is uncovered?

It needs to be evaluated and repaired as required before the assembly continues. A useful proposal states the deck replacement rates, included allowance and approval process so discoveries can be documented and priced consistently.

Do I need a permit and code upgrades?

A roof replacement generally involves permits and inspections. Deck attachment, secondary water protection and other retrofit provisions may apply. Ask the building department and project team to confirm the applicable requirements for the building, roof scope and permit date.

Does the 25 percent rule require a complete re-roof?

Not in every case. Florida law provides an exception for qualifying systems or sections built, repaired or replaced under the 2007 Florida Building Code or later. Have the existing roof records reviewed when deciding between repair and replacement.

Will insurance pay for replacement or code upgrades?

Coverage depends on the policy, cause of loss, limits and insurer’s determination. Ask your carrier about replacement-cost and law-and-ordinance coverage. Perkins can discuss the roof scope but cannot determine what your policy owes.

Can I finance a roof replacement?

The Financing link in the main menu opens the application of the financing provider Perkins works with. Availability, approval and terms are set by the provider, and no approval is promised.

How should I compare roof estimates?

Compare the assembly and work behind the finish: tear-off, deck allowances, underlayment, flashing, fastening, ventilation, permits, cleanup and warranty terms. Ask each contractor to explain exclusions and the process for changed conditions.

What if I only need a repair?

Start with a condition review and the reason for the leak. A targeted repair may be appropriate where the surrounding system is serviceable. The inspection should inform the scope before a replacement is selected.

Google reviews

What customers say about Perkins

★ 4.8 Miami · 175 reviews★ 5.0 Jupiter · 53 reviews

Google review

“Forget about calling anyone else Perkins is the best in my opinion.”

William RawlsMiami office ·

Google review

“Quality of their work was outstanding. Extremely happy with these guys.”

Nancy YeatsJupiter office ·

Reviews from Google Maps. All Miami reviews ↗All Jupiter reviews ↗

Check Perkins before you hire

Your next step

Let’s look at your roof.

Contact Miami or Jupiter with your property address and the work you have in mind. The team will help confirm the right next step.