A clearer path from building concerns to coordinated work.

Roofing, restoration and exterior construction for South Florida associations. Start with the condition of your property—and a plan for the people who call it home.

Milestone inspections, SIRS and the roof: the 2026 guide for boards ↗

Condo roof replacement: approvals, bids and assessments for boards ↗

Request a board consultation Explore the building scope
A coastal tower and its connected building systems ROOF + ENVELOPEOPENINGSACCESSCOASTAL BUILDING / CONNECTED SYSTEMS

★ 4.8 · 5.0228 Google reviews · Miami 4.8 · Jupiter 5.0

Since 1980FRSA & RCASF member · Polyglass contractor

Meet the Perkins team ↗

Look at the connections

One building.
Interconnected decisions.

A repair at one surface can affect another. Explore the exterior, roof, openings and logistics together before narrowing the scope.

Balcony and façade work zones ROOF + ENVELOPEOPENINGSACCESSCOASTAL BUILDING / CONNECTED SYSTEMS
Work zones · not a site-specific protection or access plan

Exterior & balconies

Care for the building’s outer edge.

Coordinate concrete repairs, façade finishes, sealants and waterproofing around the building’s existing condition and the design professional’s scope.

  • Repair details and investigation of concealed conditions
  • Balcony restrictions and protection of areas below
  • Compatible finishes at adjoining materials
Concrete restoration ↗
Roof and roof-level coordination ROOF + ENVELOPEOPENINGSACCESSCOASTAL BUILDING / CONNECTED SYSTEMS
Work zones · not a site-specific protection or access plan

Roof & waterproofing

Connect the roof to the whole building.

Roofing work reaches beyond the covering. Plan around drainage, equipment, penetrations, roof access and the transitions into adjoining walls.

  • Existing assembly and proposed system review
  • Equipment and access coordination
  • Temporary protection and inspection hold points
Commercial roofing ↗
Window replacement by building stack ROOF + ENVELOPEOPENINGSACCESSCOASTAL BUILDING / CONNECTED SYSTEMS
Work zones · not a site-specific protection or access plan

Windows & openings

A building-wide program, one opening at a time.

Window and sliding-door replacement needs a coordinated approach to product selection, installation details, access into units and restoration around each opening.

  • Documented product and opening requirements
  • Unit access and resident notice arrangements
  • Perimeter waterproofing and interior finish boundaries
Impact windows ↗
Access, staging and occupied-building routes ROOF + ENVELOPEOPENINGSACCESSCOASTAL BUILDING / CONNECTED SYSTEMS
Work zones · not a site-specific protection or access plan

Occupied logistics

Construction with daily life in mind.

Identify how residents, deliveries and building operations interact with the work. The access and protection plan should be agreed before mobilization.

  • Entrances, walkways, parking and staging zones
  • Work hours, notices and a reporting contact
  • Weather interruptions and safe reopening criteria
General contracting ↗

Life around the work

The logistics deserve
their own plan.

Occupancy is a project-specific decision. Discuss temporary restrictions, resident communications and protection measures before agreeing how each phase will proceed.

People & access

Map resident routes, unit appointments, deliveries and emergency access. Agree who issues notices and how restrictions are explained.

Work & protection

Identify staging, material movement, overhead work and protection of neighboring areas. Determine where specialist access planning is needed.

Weather & interruptions

Discuss temporary protection, exposed work and conditions that change the sequence. Establish how revised access and work windows are communicated.

Decisions & reporting

Agree a board or manager contact, progress updates, photographic records and a written process for decisions and changes.

For boards & property managers

Make the proposal
easier to evaluate.

A useful proposal connects the investigation, defined work and practical constraints. Ask for clarity before comparing the headline price.

Discuss your building
  • Defined scopeRepair areas, quantities, specifications and the assumptions behind the price.
  • ResponsibilitiesContracting entity, qualified trades, design professionals and permit coordination.
  • Access & phasesResident restrictions, staging, work windows, protection and inspection dependencies.
  • ChangesConcealed conditions, allowances, exclusions and written authorization before added work.
  • CloseoutFinal inspections, punch list, photographs, care guidance and applicable warranties.

Beyond a single project

A building brief.
Not a blanket promise.

Bring both the construction priorities and the everyday maintenance needs. Each item needs a defined scope, suitable access and the right provider.

Exterior maintenance

Discuss façade repairs, sealant renewal, cleaning, window cleaning, power washing and general handyman requests. Confirm methods and suitability for existing surfaces.

Preventative planning

Organize condition records, recurring leaks, inspection findings and maintenance history. Agree the tasks, review frequency and record keeping for any maintenance arrangement.

Specialist building systems

Elevators, HVAC, plumbing, electrical and security systems need qualified specialist providers. Where construction affects these systems, clarify the provider and coordination responsibilities.

Have a report? Start there.

Share the engineer’s findings, reserve study or existing repair specification. The construction scope should respond to those documents; it does not replace a professional inspection, SIRS, engineering design or the association’s reporting obligations. Confirm current requirements with the responsible professionals and authorities.

From the published portfolio

Roof restoration.
Above Bal Harbour.

Explore Perkins’ published Majestic Towers roof-restoration record. These photographs document roofing work—not a claim that Perkins constructed or renovated the entire tower.

View the roof-restoration project ↗
Aerial view of Majestic Towers and its roof from Perkins’ Bal Harbour roof-restoration record.
Majestic Towers · published Perkins project
Closer aerial view of the roof and equipment at Majestic Towers, overlooking the beach.
Roof-level detail · Bal Harbour

Prepare for the first conversation

Bring the building
into focus.

A concise brief helps the team understand the condition, priorities and approvals needed to move forward.

Property & people

Building address, association contact, occupancy and access constraints.

Conditions & records

Photos, reports, drawings, known leaks and previous repair information.

Priorities & decisions

Budget parameters, target dates, board approval process and unresolved questions.

Arrange a board consultation ↗

Practical answers

Before the board
makes a decision.

Clear expectations for scope, residents, qualified trades and the next step.

Construction advice library ↗
What condo and high-rise work can we discuss with Perkins?

Bring roofing, waterproofing, concrete restoration, exterior finishes, windows, doors and associated construction or maintenance requirements. The team confirms the scope, responsible contracting entity, qualified trades and availability for your building.

Can residents remain in the building during construction?

That depends on the work, building condition and protection requirements. Some projects can be phased around occupied areas; others require temporary restrictions or relocation from affected spaces. Confirm the occupancy plan with the project team and relevant authorities rather than assuming unrestricted access.

How should unit and balcony access be planned?

Agree the affected areas, notice process, authorized access arrangements, resident contacts and restrictions with the association or manager. Include how missed appointments, changed conditions and reopening will be communicated.

Can a board provide an inspection report or reserve study?

Yes. Share available reports, drawings, repair recommendations and maintenance records so the proposed work can be discussed against documented needs. Construction pricing does not replace a required engineering inspection, reserve study or the professional judgment of the report’s author.

Will this work satisfy milestone inspection or SIRS requirements?

No general promise can be made from a service page. The association should confirm its applicable inspection, reporting and reserve-study obligations with its qualified professionals and the responsible authorities. Any construction agreement must identify the specific repair scope and required closeout documentation.

What about elevators, HVAC, plumbing, electrical or security systems?

List these systems in the building brief if the project affects them. Specialist work requires confirmation of the qualified provider, licensing, scope and responsibility. Do not assume elevator inspections or repairs, HVAC maintenance, plumbing, electrical or security upgrades are included in a general construction proposal.

Can we discuss preventative maintenance and exterior cleaning?

Yes. Bring roof and façade condition records, cleaning needs, known leaks and recurring maintenance issues. Discuss inspection frequency, suitable cleaning methods, access, record keeping and which tasks are included. Window cleaning, power washing and handyman requests should be confirmed individually.

How should the board compare proposals?

Compare the same repair quantities, specifications, access arrangements, protection, permit responsibilities, allowances, exclusions and closeout requirements. Ask how concealed conditions and written change approvals will be handled rather than comparing only the total price.

What should happen if an urgent building problem develops?

Call the office to discuss the issue and current availability. This page does not promise 24-hour dispatch or an immediate response. For an immediate threat to people, fire, electrical danger or suspected structural instability, keep people clear and contact emergency services or the appropriate authority.

What determines the cost and timeline?

Scope, existing conditions, access, engineering, approvals, material procurement, resident coordination and weather all influence the plan. Share the association’s target dates and budget constraints; price, schedule, reporting and exclusions are confirmed in the project agreement.

A considered next step

Planning a condo re-roof?
Talk to us before the bid.

Talk with Miami or Jupiter about your association’s concerns, available reports and construction priorities.