Ceiling air sealing limits air movement; roof flashing and coverings manage rainwater. Identify the boundary being repaired so neither trade assumes the other has solved both problems.
Name the boundary being repaired
Ask each contractor to describe where its work occurs: at the ceiling between rooms and attic, at the exterior roof covering, or at a roof-wall transition. Put those locations on a sketch. If a proposal simply says sealing, request a more precise description of the intended materials and interfaces. This prevents two contractors from using the same word for work that addresses different parts of the building.
Separate symptoms from assignments
For a ceiling stain, gather the timing and location evidence before deciding which trade should respond. For an air-leakage concern, ask what observation or assessment supports the proposed ceiling work. Where both are present, keep separate line items and responsibilities. A completed air-sealing visit should not automatically close a roof leak complaint, and a roof repair should not silently absorb unrelated insulation or mechanical work.
Keep closeout records specific
Request photographs and notes that correspond to each boundary on the original sketch. Record inaccessible penetrations, excluded wall areas and any additional investigation recommended. If another contractor will cover the work, establish the handoff before that happens. Save product information for the installed materials and the applicable instructions provided by the contractor. The useful outcome is a clear record of which pathway was addressed and which remaining observations need attention.
An owner can make the distinction visible in a simple work-order table: symptom, location, proposed work, responsible trade and follow-up. Leave a row open where the cause is not established. This reduces the temptation to describe all unfinished items as sealing work and helps the project coordinator identify whether the next visit needs roofing access, attic access or a separate mechanical assessment.