Closing vents changes the building enclosure and must be coordinated with insulation, air sealing and mechanical conditions. Request an assembly design rather than accepting isolated vent closures as a complete conversion.
Treat conversion as an assembly decision
Before agreeing to close attic vents, request a written description of the proposed roof and attic assembly. Ask where insulation and the air-control boundary will be located and which existing materials will remain. Identify who is responsible for coordinating the design with mechanical equipment. A proposal that lists only vent closure and foam quantity leaves important questions about the completed space unanswered.
Put trade interfaces on the drawing
Ask the designer to identify roof penetrations, attic access, equipment servicing and dedicated exhaust routes. Have each contractor confirm the part of the work included in its price. If existing materials must be removed or altered, obtain that scope before the conversion begins. Keep product instructions and applicable project requirements with the proposal; an older generic diagram should not substitute for the actual assembly being installed.
Request a usable operations handoff
The owner should receive instructions describing any mechanical controls, inspection access and maintenance responsibilities introduced by the conversion. Ask how future reroofing work should account for the insulation underneath. Record areas that could not be inspected before concealment. If damp material was found, obtain its disposition separately instead of letting the conversion paperwork imply that all prior moisture problems were resolved. Clear ownership of these decisions is more useful than an unsupported promise of a permanently dry attic.
An owner considering competing conversion proposals should request the same information from both contractors. Identify the proposed boundary, existing layers to remain, mechanical responsibilities and access provisions. Differences should be explained before prices are compared. Ask who will answer assembly questions during future roof work; that contact and the final specification belong in the long-term property records alongside the roof warranty documents.
For related project preparation, see roof leak or air conditioning condensation and a roof report should separate observations from conclusions. Bring the relevant photographs and existing proposal to Perkins when discussing the roof-specific scope.
Technical references: PNNL: moisture control in unvented attics; PNNL: vented-to-unvented attic checklist. These references provide background; the selected assembly and applicable project requirements determine the installation detail.