The existing roof should be assessed before equipment changes access and introduces attachment details. Roof condition, remaining repair options, and future maintenance needs can affect project sequencing. The solar proposal alone may not resolve those questions.

What to do next

Coordinate roof and solar reviews before installation. Ask who designs and warrants the roof interfaces and how future roof work would be handled. Keep the roof assessment independent of any assumption that equipment installation renews the underlying assembly.